Pioneering the limitless possibilities of solid-drawn steel pipe
menu
Plant Information / Processes
Drawing Plant - Drawing
Bar material manufacturing process
1
Material acceptance
2
Heat treatment
3
Pickling/Coating treatment
4
Pointing process
5
Lubricating treatment
6
Drawing process
7
Straightening process
8
Eddy current testing
9
Cutting/Chamfering process
10
Appearance/Dimension inspection
All products are shipped only after a stringent external inspection.
11
Rust prevention treatment
12
Packaging/Shipment
Copyright©2018 Toshida kogyo Co.,ltd All rights reserved.